Tobyhanna Army Depot
- Locatation: Coolbaugh Township, PA
- Contract Awarded: November 2020
- Project Duration: 8 months
- Project Value: $45,000.00
Thomas Joseph Solutions, Inc. was a prime on this government project. This project includes interior and exterior concrete coatings. Floor epoxy overlay and epoxy control joint installation and filler. Concrete repair and restoration.
Horizontal Test Facility
- Location: Naval Weapons Station China Lakes, CA
- Contract Awarded: April 2020
- Project Duration: 10 months
- Project Value: $450,000.00
Thomas Joseph Solutions, Inc. was a subcontractor on this government job. This project included interior and exterior concrete coatings. Floor epoxy overlay. Interior and exterior elastomeric water proofing. Concrete floor resurfacing. Epoxy crack injection and repair. Interior painting scope included surface preparation and painting of elevator pit, various office rooms and door frames. Required to adhere to Infection Control Risk Assessment (ICRA) Class III/Type C Medical Facility Requirements.
NO PHOTOS WERE ALLOWED ON THIS PROJECT.
Tioga IV Warehouse
- Location: Philadelphia, PA.
- Contract Awarded: April 2020
- Project Duration: 2 months
- Project Value: $25,000.00
Thomas Joseph Solutions, Inc. was a subcontractor on this government job that was completed in May 2020. Industrial painting including overhead door frames, CMU units, bollards, railings, line striping and painting miscellaneous metal surfaces.
National Oceanic and Atmospheric Administration (NOAA) Northeast Fisheries Science Center
- Locatation: James J. Howard Marine Science Laboratory in Sandy Hook, NJ.
- Contract Awarded: August 2020
- Project Duration: 2 months
- Project Value: $19,560.00
Thomas Joseph Solutions Inc. was a prime contractor on this government project. Epoxy floor resurfacing and painting of laboratory walls. Dust control was extremely important on this project due to the location of project.
Sierra Army Depot Buildings 356 & 360
- Location: Herlong, CA
- Contract Awarded: August 2019
- Project Duration: < 2 months
- Project Value: $675,000.00
Thomas Joseph Solutions, Inc. was a subcontractor on this government job which took less than 2 months to complete. 100,000 square foot resinous flooring installation. Existing concrete preparation and profiling. Expansion and control joint cleaning and cut out. Epoxy control joint installation and filler. Quarter inch epoxy overlay and entire surface.